1. The construction personnel who install zinc-steel shutters must be those who have received relevant operation training, and must pass the examination before entering the construction site to install the shutters. When installing, wear a hat.
2. When installing zinc-steel shutters, if hanging operations are to be carried out, a reliable foothold should be set up, and corresponding protective nets, railings and other protective facilities should be equipped according to the actual situation to ensure the safety of the constructors.
3. When transporting zinc-steel shutters, construction personnel should ensure its safety. If multiple people are used to transport them, they should be connected stably to avoid things from falling. At the same time, all zinc-steel shutters should be placed stably to avoid Store at the edge of the floor.
4. If you want to use the derrick to transport zinc steel shutters, pay attention to safety. After the hanging basket is stopped, the unloading work is carried out. When not in use, it needs to be closed in time and a platform protection door should be installed.
5. When installing zinc steel shutters, if you use hand-held electric tools, you must ensure that the operator is professionally trained, and you must know the structure and performance principles of the machine to avoid accidents during the construction process.
Previous:
What should I do if the internal unit of the wall-mounted air conditioner drips?
Next:Radiator installation method process |
Back to list |
Products Recommended
The main products of our factory: side blower, ring blower, compound air-conditioning unit, textile dust removal equipment and various air-conditioning componentsWhat should I do if the internal unit of the wall-mounted air conditioner drips?
2021-07-121. The exchanger dripsThe internal unit of the air conditioner is overheated, and the exchanger in the internal unit is d…Key points for installation of compound air-conditioning unit
2021-07-121. The combined air-conditioning unit can be installed on a concrete platform or a base made of section steel. The height…How to properly use air conditioning for heating?
2021-07-12Set a reasonable temperature:In winter, the air conditioner temperature can be reduced by 2 degrees to save more than 10%…The correct operation steps for installing the shutters of the outside air conditioner
2021-07-121. The construction personnel who install zinc-steel shutters must be those who have received relevant operation training…Address: No. 12, Tianjin Road, Economic Development Zone, Xinyi City, Jiangsu Province
Phone: +86-0516-88865398
Mobile: +86-138-0522-5976
Fax: +86-0516-88865398
Email: xfkt2007@163.com